Phase of the pilot design

A necessary condition for implementation of the system to develop a pilot project. In order to effectively implement the pilot project is proposed in the banks to create a "sponsorship committee" composed of the heads would be all business units and service controlling, risk management, personnel and information technology. "The sponsorship committee" to coordinate the work of various pilot commands that can be generated by the business or key customer groups. Pilots and crew must identify causal relationships, key performance indicators, their optimal value, etc. Phase widespread. Prepare enough material for a pilot project paves the way for wide introduction RIBSC at all levels of bank management. Phase improvement. Due to changes in the external environment is necessary to clarify the strategic objectives, and hence the set of indicators and their target values, changes in business processes and responsible persons. Revision of the system parameters is carried out in order to improve the strategy and improve its implementation. It should be noted that the implementation is relatively RIBSC long-term process, whose duration is determined by the level of corporate culture, staff development, performance management, information management, etc. RIBSC as a comprehensive tool for controlling provides the necessary information for effective management of strategic and operational portfolio. Topic: Analysis of controlling