Instruction on Occupational Health and Safety held in hiring the employee, as well as on a fixed schedule, ie includes all of the available types of instruction: introductory, primary, second, unplanned instruction in emergency events and the target. Consequence of the exercises and instruction on safety is the low level of occupational injuries. According ONTP 24-86 premise bank explosion and fire risk is classified as "B" (as the building does not belong to the category "A" or "B" and the total floor area "B" category exceeds 10% of the total area of all buildings). The degree of fire resistance of building in which the bank is located, is equal to II. The fire in the premises of the bank may be the fault elektrokomunikatsiynogo equipment and improper use of electrical equipment. Fire prevention includes Privatbank measures such as instruction, testing remedies at least once in six months, using no more than 80% of the rated capacity of the equipment, the use of alarm systems direct action. Fire fighting equipment before firemen stand Privat, which includes two carbon dioxide fire extinguishers BB-5, a box of sand, a fire blanket, two shovels, crowbars and axes, as well as a system for fire water with two fire hoses. In the room where the fire-cock, there are instructions for its use. Installed sensors: heat (in all rooms except the archive), smoke (archive). In the bank as a whole combustibles are not stored. The scheme of evacuation in case of fire approved by the head office and posted in a conspicuous place (in the corridor and evacuation routes). On evacuation routes and emergency lighting installed. Exit width is 1.5 meters. Keys to the exit located in a prominent place in the protection. On the billboard is a statement against a fire. Category: TECHNICAL ISSUES OF WORK | Tags: safety